
350m² of crazy paving in one day
Crazy paving is the slowest paving to point by hand because every joint is a different width and shape. On this coastal pool terrace the crew poured and squeegeed Flowpoint across about 350m² and finished the jointing in a single day.
- Irregular joints filled in one pass
- Clean surface after wash-off
- Ready for foot traffic the same day













